1.Greenhouse Specification
Greenhouse Style |
Arch Type Greenhouse |
Span Type |
Single-span |
Greenhouse Structure |
Hot-dip Galvanized Steel Pipe (Round tube) |
Covering Material |
PE film,PO film,Fenggu film |
Film Thickness |
0.06mm,0.08mm,0.12mm,0.15mm,0.20mm |
Layer |
Single,Double |
Transmittance Rate |
>70% |
Film Color |
Transparent,White |
Service Time |
>5 Years |
We could recommend the most suitable film to you according to your local climate and your crop.We own professional and outstanding technology group who have been engaged in greenhouse construction more than 15 years.
2. Greenhouse System(depend on your request)
Ventilation |
Manual ventilation |
Electrical ventilation |
Heating System |
Hot water heating |
hot wind heating |
Electrical heating |
Cooling system |
Cooling pad,aluminum alloy frame and cooling pad water supply system |
Cooling Fan,Size:1380x1380mm,1000x1000mm,750x750mm |
Automatic control system |
We are also specialized in greenhouse accessories,if you want to know more about them,please feel free to contact me.
3.Our Main Greenhouse Type
★Venlo type PC(polycarbonate)sheet greenhouse
★Venlo type Glass Greenhouse
★Muti-span arch-type film greenhouse
★Single-span arch-type film greenhouse
5.Factory Show
6.Our Shipement and Package
7.Mechanical Equipment Needed
1.Sterilization of Boiler
70# is 70 cm in diameter, 2.1 m in height, and weighs 230 kg. It is steamed in 3000-4000 bags at a time.
80# 80 cm in diameter, a height of 2.1 m, and a weight of 350 kg.
100#, 100 cm in diameter, 2.2 m in height, 480 kg in weight, 8000-9000 bags for steaming.
Two steam holes, with two chimneys and accessories
2.Bagging Machine
Electromagnetic clutch bagging machine,
power 2.2 kw, motor 2800 RPM.
Suitable for 12-26 bags,
working efficiency 900-1200 bags/hour
3.
Mixing Machine
The power of electric mixing machine is 3kw in three phases or 4kw in two phases.
The working efficiency is 3-5 tons/hour and the weight is about 130 kilograms.
8.Our Construction Site
9.FAQ
Q: How long is your delivery time?
A: Generally it is 20-30 days after order.
Q: How to install the greenhouse? Do you provide installation service?
A: We will provide paper or video building manual, or if needed we will send engineer
to do installation guidance..